Knomentous Customer Login Cable Tracking System
Menu

Improving Cable Reliability at Less Cost with Rejuvenation

January 2, 2018

by Rick Hudson, Salt River ProjectNovinium cable rejuvenation

WE Magazine, Winter 2017/2018

“With rejuvenation, SRP breaks even at only five years of failure-free operation. In fact, the cost of cable replacement is as much as 10 times the current cost of cable rejuvenation.”

About Rick Hudson

RICK HUDSON started working for SRP 30 years ago. He has worked primarily in the maintenance of the distribution system and is currently an engineering supervisor in maintenance engineering.