Home Answers Support Contact Company

NRI's (Guides & Ref's)

Transparency
This is what we do and how we do it. No secret handshakes; just simple, easy-to-follow instructions. Click here to understand our guiding vision, values, and code of conduct. To download a Novinium Rejuvenation Instruction (NRI) within your browser click the "PDF" icon. The NRI’s are continually updated to comply with regulatory changes, and to incorporate technological and procedural improvements. It is best not to rely upon printed copies of any given NRI to be up-to-date. Always check to ensure that the most current version of a particular NRI is being used before beginning work.
Novinium Acronyms & Definitions

A glossary of Novinium acronyms
 
20090514
00 General Safety

Electrical and General safety procedures.
Alberta, Canada
British Columbia, Canada

 
20091117
03 Impulse Phaser

Operating instructions for the use of the Timco Instruments Impulse Phaser.

 
20090922
10 Visual Inspection and Measurement

Instructions for Inspection and Measurement of Power Cables.

 
20111223
11 Bending Radius Template

Print this handy template, laminate with 5 mil plastic, and trim to size.

20120127
12 Electronic Cable Diagnosis and Pinpointing

Instructions to use the TDR (time-domain reflectometer) and RF (radio frequency) location to pinpoint splices and neutral corrosion.

 
20120125
20

Tailored Formulation™ & Tailored Pressure™

Describes the patented method to make optimized fluid formulation and sustained pressure choices


20120130
21 Cable Table

This table provides detailed cable geometry data and tailored injection pressure (TIP).
 
20100907
25 N-Ter™ Technology
Describes the methods of Novinium Thermally Enhanced Rejuvenation which allows precise tailored quantities of Perficio™ brand and Ultrinium™ brand fluids to be delivered to cables.
 
20080429
30 IA Installation - Connector Replacement & Strand Preparation

Instructions to replace existing compression connectors and prepare conductor strands on all components in preparation for injection adaptor (IA) installation.


20110607
31 IA Installation - Dead-front Termination

Instructions to install patented injection adaptors in all dead-front terminations and splices where unidirectional injection is required.


20120203
32 IA Installation - Dead-front Splices

Instructions to install patented injection adaptors in splices where bidirectional or flow-through injection is required.

 
20090315
33 Unsustained Pressure Rejuvenation Splice Installation

Instructions to prepare and install molded splices for unsustained pressure injection.

 
20110228
34 Live Front Injection Applications

Instructions for preparation and installation of components for Sustained Pressure (SPR) or Unsustained Pressure (UPR) injection on Live-Front terminations


20120309
36 Injection Elbow – Installation & Operating Instructions (15kV-25kV)

Instruction to install and operate Novinium proprietary 15kV injection elbows for unsustained pressure injection.


20101217
39 NRI 39: Connector Modification

Instructions for modifying electrical connectors for use with patented Injection Adapters (IAs)


20120411
40 IT Installation & Removal

Instructions to install and remove the injection tool (IT) from cable injection adaptors.


20111021
41 IT Maintenance

Instructions to make minor field repairs to the Injection Tool.


20100607
45 Quick Disconnect Injection Tool

Instructions for Quick Disconnect Injection Tool & Live Front Access Interface Installation & Removal


20111018
46 Live-Front Access Interface

Instructions for Live Front Access Interface (LFAI) Installation & Removal


20120309
50 Flow & Pressure Testing

Instructions to determine the pneumatic resistance to flow of cables and cable terminations and confirm leak-free operation.


20120206
60 Tailored Injection™

Instructions to inject cables with patented and patent pending Novinium technology.


20120124
61 Sustained Pressure Rejuvenation

Instructions to inject cables with patented and patent pending sustained pressure injection technology for optimum post-injection reliability.


20140225
62 Unsustained Pressure Rejuvenation

Instructions to inject cables with patented and patent pending unsustained pressure injection technology for second-best post-injection reliability for cases where sustained pressure is not practical.


20120213
69 Tailored Injection (N-Rex™)

Instructions to inject very long cable segments such as submarine cables with patented and patent pending Novinium technology


20101110
70 Troubleshooting Cable Flow

Instructions to address flow issues in cables, terminators, and splices.


20090901
75 Operation and Maintenance: Tanks and CO2

Instructions Operations and Maintenance of Novinium Injection Reciever and CO2 tanks.


20140225
80 Neutral Corrosion Repair

Instructions to correct and mitigate neutral corrosion.


20120125
90 Novinium Injection Tracking System

User instructions for entering, maintaining and accessing data in the NITS system.


Available within
NITS portal
93 Failure Sample Handling

Instructions for obtaining a failure sample of a Novinium treated cable.


20120127
98 Field Verification Checklist

Instructions for verifying the safety and quality of Novinium brand services and products.


Available within
NITS portal
99 Cutting a Treated Cable

Instructions for the unusual case where it is necessary to cut a Novinium treated cable.


20090806
© 2006 - 2014 Novinium, Inc.
MSDS             Contact             Site Map             Trademarks             Terms of Use
The Novinium technology described on these pages includes patented and patent pending technologies.